国产精品亚洲专区无码唯爱网r_国产91精品黄片_亚洲最大成人免费久久_天天躁久久躁中文字字幕_欧美黄色一级视频免费久久_亚洲少妇精品无码_妓女综合网99页_在线观看国产网站a片_真实女人一级特黄大片视频_福利免费在线影院免费观看全集剧情

Environmental equipment | home of craftsmen

Professional supplier and service provider of thermal equipment

Uses and classification of hot water boilers

Hot water boilers are mainly used for two purposes: heating and bathing. Hot water boiler through the hot water circulation pump circulating insulation tank of hot water, week after week to the tank of hot water heating, you can realize the purpose of bathing; hot water boiler through the hot water circulation pump circulating hot water heating pipeline through the radiators (radiators) can achieve the requirements of people's heating; hot water boiler and hot water circulation pump with the heat exchanger to achieve the dual function of bathing and heating.


Hot water boiler according to different fuels can be divided into electric hot water boiler, oil hot water boiler, gas hot water boiler, coal-fired hot water boiler, etc.; according to whether the pressure can be divided into atmospheric hot water boiler and pressurized hot water boiler two kinds of hot water boilers, we usually say that "hot water boiler" refers to atmospheric hot water boiler, because of its operational safety, people bath or heating Most of them adopt this kind of normal pressure hot water boiler.


Natural circulation of the hot water boiler, inlet and outlet water from the top of the upper cylinder take over, by the inlet distribution pipe will guide the inlet water into the down tube into the front and side of the lower combined box, through the water-cooled wall pipe heating rise. The front and rear ends of the upper drum are provided with water traps at the boundary between the falling and rising water streams, which only isolate the lower half of the drum cross-section. Forced circulation, the water into the front end of the lower box, from the front water-cooled wall tube up to the upper cylinder (this time the front water-cooled wall down tube canceled), and then transferred to the side water-cooled wall tube down tube to the side of the lower box, and then into the side water-cooled wall tube up to the upper cylinder, but also from the front convection tube bundle down to the lower cylinder, and finally in the upper and lower cylinder between the upper and lower cylinder and circuitous a few processes from the upper cylinder out of the back end of the water.


Contact Us

National service hotline:13829262146

Address:No. 6, Road 1, Shegang Industrial Zone, Humen Town, Dongguan, China

TEL:0769-85245101

fax:0769-85247528

Email:13829262146@139.com

technical support:MYIT

Scan QR code to share to WeChat

Online consultation
Contact number

0769-85245101